Applying for the Home Renovation Savings Program

Your installer files it, in two parts. The pre-installation application goes in before anything is bought, and the post-installation claim within 30 days of the install. Once the IESO approves the claim in writing, it pays you up to $5,000 for rooftop panels and up to $5,000 for a paired battery (Home Renovation Savings, read 2026-10-28).

A SolarEdge inverter and connection unit mounted on a plywood backboard after an install
30 daysfrom the install for your installer to file the Home Renovation Savings rebate claim (program requirements, read 2026-10-28)
On this page
  1. What is the Home Renovation Savings Program?
  2. How much is the $10,000 solar and battery rebate?
  3. Who is eligible for the Home Renovation Savings solar rebate?
  4. Why the choice between rebate and net metering comes first
  5. How to apply for the Home Renovation Savings Program, step by step
  6. What goes in the pre-installation application
  7. What the post-installation claim needs
  8. How long the application takes
  9. Combining the rebate with the Better Homes Ottawa Loan
  10. Questions to ask your installer before you apply
  11. How KAJK handles the application
  12. Questions

What is the Home Renovation Savings Program?

It is Ontario's home energy rebate program, run by Enbridge Gas and the Independent Electricity System Operator (IESO) under its Save on Energy brand, and open since 2025-01-28 (Government of Ontario). The solar and battery stream belongs to the IESO, which approves each application, signs the participant agreement with you and pays the rebate. It needs no home energy assessment.

On 2026-10-28 the program's solar page still offered up to $5,000 back for panels and up to $5,000 for a battery, and the stream's documents, all dated October 2025, set no closing date. Every amount, the net metering trade-off and Ontario's other incentives are on our Home Renovation Savings Program page.

How much is the $10,000 solar and battery rebate?

The $10,000 is two rebates of up to $5,000 each, worked out separately from your quote:

  • Panels earn $1,000 per kW DC of nameplate capacity, not rounded, so a 4.84 kW array earns up to $4,840 (program FAQ). The panel rebate hits its cap at 5 kW.
  • A battery earns $300 per kWh of storage, so the 13.5 kWh battery the program calls typical earns up to $4,050, and the cap arrives at about 16.7 kWh.
  • Each rebate also stops at half of that measure's eligible costs: equipment, permits, approvals and labour, before HST. Financing, insurance, later maintenance, spare parts and tools do not count.

That is why the application asks for solar and battery costs on separate lines, each split into material, labour and other costs before tax. Where panels and battery are bought as a package, the contractor breaks the equipment cost out for each.

Who is eligible for the Home Renovation Savings solar rebate?

You qualify when you, the home and the system each meet the stream's rules (Program Stream Requirements, version October 2025, read 2026-10-28):

You
18 or older, the owner, and the person paying for the system. A landlord applies for a rented home; a tenant cannot apply on the owner's behalf.
The home
Detached, semi-detached, row house, townhome or a mobile home on a permanent foundation, on a residential hydro account with any Ontario utility except Cornwall Electric, whose customers are on the Hydro-Québec grid.
First-time solar
No solar panels or storage on the home yet. Adding to an existing array, or to a microFIT system, is outside the rebate.
On a roof
The panels go on the house or on a permanent existing structure on the same meter, such as a detached garage. Ground-mounted arrays are excluded, so KAJK connects ground mounts under net metering instead.
A new system you own
New, bought in Canada and owned by you: leases and third-party ownership are out. A licensed electrical contractor designs and installs it, and a battery is paired with the new panels and charged mainly from them.
Power used as it is made
The system is sized for load displacement: the house uses what the panels make, and the system is never net-metered.

Why the choice between rebate and net metering comes first

Every form in the application assumes a load displacement system. The proposal, the pre-installation application and your utility's generation connection application all have to say load displacement. A net metering agreement on a rebated system means repaying the rebate within 30 days of the IESO's notice (Participant Agreement, s. 5).

So decide before the paperwork starts. A system sized to the power your home uses as it is made suits the rebate; one sized to bank summer credit for the winter suits net metering in Ontario. On a free assessment we model your roof both ways from 12 months of your bills.

How to apply for the Home Renovation Savings Program, step by step

In order, from the program's solar page, its FAQ and the Program Stream Requirements, read 2026-10-28. Your installer files steps 4 and 8 for you.

  1. Check your eligibility

    Fill in the short eligibility form on homerenovationsavings.ca, or bring the question to your installer's assessment. Use the program's own site: it warns that scammers run fake rebate websites and impersonate contractors.

  2. Size the system to your home

    The program puts a typical load displacement system at 5 to 10 kW with a 13.5 kWh battery, and may ask for electricity bills behind a larger one. If an EV charger, heat pump or hot tub is coming, it suggests installing that first so the panels are sized to the new load.

  3. Talk to your utility

    The program urges a conversation with your local distribution company about the connection and the largest system it allows. For a system of 12 kW AC or less, Hydro Ottawa answers a service request with a service layout in 15 days, up to 60 for complex projects, and the layout stays valid for 90 days (Hydro Ottawa, read 2026-10-28).

  4. Your installer files for pre-approval

    You sign the participant agreement, and the contractor uploads it with the pre-installation application and a proposal whose quote is dated within 60 days of the submission. The program aims to reply within a week with an approval or a list of what to fix.

  5. Wait for both approvals

    Order no equipment and sign no purchase agreement until the program's written pre-approval and your utility's approval are both in hand. A binding commitment made before them rules the rebate out.

  6. Permits and installation

    The installer applies for the City of Ottawa building permit where one is needed (solar collectors of 5 m² or more on a building, City of Ottawa, read 2026-10-01), files the Electrical Safety Authority notification, and finishes the install within 12 months of pre-approval.

  7. Inspection and connection

    The Electrical Safety Authority (ESA) inspects the work and issues its Connection Authorization, and the utility connects the system after that. The ESA Certificate of Acceptance is kept for the claim.

  8. The claim and the rebate

    Within 30 days of the install, the contractor uploads the post-installation claim and marks it ready for review. The IESO approves it in writing, recalculates the rebate on the final figures, and pays it to you. The recalculated rebate cannot rise more than 10% above the pre-approved amount.

What goes in the pre-installation application

The program's Pre-Installation Application Checklist (version October 2025) lists every field. The online form keeps no draft, so everything is gathered first, and a detail that does not match the proposal sends the application back for resubmission.

Your details
Name, phone and email, the installation address, a mailing address if it differs, and the name of your local distribution company.
The home and the installer
The home type, and the installer's company, contact name, phone and email. Two contractors, one for the panels and one for the battery, can share a project by arrangement with solar@homerenovationsavings.ca.
The panels
Orientation (east, west, south, south-east or south-west), where they will sit, the tilt angle, the nameplate capacity in kW DC, and the brand, model and country of manufacture.
The battery
Capacity in kWh, brand, model and country of manufacture, plus the loads it will serve now or later, such as an EV charger, a heat pump or a hot tub.
Costs and other funding
Material, labour and other costs before tax, solar and battery on separate lines, the rebate each works out to, and any grant, utility incentive or manufacturer rebate on the same work.
Attachments
The project proposal (a quote or draft invoice dated within 60 days, equipment spec sheets and the sizing rationale, all describing load displacement only), your signed participant agreement, and a single line diagram if your utility asks for one.

What the post-installation claim needs

The claim goes through the program's contractor portal within 30 days of the install (Post-Installation Application Checklist, version October 2025, read 2026-10-28). It carries four sets of documents:

The final invoice
Itemized like the program's sample invoice: the contractor's name, address and GST/HST number, your name and the installation address, the invoice and installation dates, material, labour and other costs, and a paid stamp or other proof of payment for every instalment.
Photos
All the panels on the roof, the battery and each inverter in full, one front-facing photo of each nameplate showing the maker, model, serial number and ratings, the utility meter (old and new if it changed) and the service panel after the work.
ESA documents
The Certificate of Acceptance, or an equivalent inspection report, and the Connection Authorization contractor copy, each showing your name and the installation address.
Utility approval
The signed generation connection application marked load displacement, and the utility's approval: a connection agreement, an offer to connect, or an email or portal confirmation.

A measure left off the application earns no rebate, and an installed system that differs from the approved one needs a written reason. Keep your own eligibility records for two years from the pre-installation application (Participant Agreement, s. 3).

How long the application takes

The application runs on five time limits, from the program's documents and the utility's page:

  • About a week for the program's reply to a pre-installation application (program FAQ).
  • 15 to 60 days for Hydro Ottawa's service layout on a system of 12 kW AC or less, and 90 days before that layout expires.
  • 60 days: the oldest a quote can be when the pre-installation application is filed.
  • 12 months from pre-approval to a finished install.
  • 30 days from the install to the post-installation claim.

The rebate is paid to you after the IESO approves the claim in writing, and until then it is not guaranteed (Participant Agreement, s. 4). The 12 months leave room for Ottawa's seasons: a project approved in the autumn can go on the roof once it is clear in the spring.

Combining the rebate with the Better Homes Ottawa Loan

The rebate cannot be combined with another Enbridge Gas, Save on Energy or Government of Ontario incentive for the same panels or battery. Money from anyone else is allowed, as long as everything together stays at or under 100% of the cost to buy and install the system, and it is listed on the pre-installation application.

In Ottawa that other money is usually the City's Better Homes Ottawa Loan: from $10,000 up to the lesser of $125,000 or 10% of the home's assessed value, at 4.33% fixed over 20 years, tied to the property, with solar photovoltaic systems and battery storage on its list of eligible measures (Better Homes Ottawa, read 2026-10-28).

The loan has its own approval. Only costs after its Notice to Proceed count, and a pre-retrofit EnerGuide assessment comes before the work. Hold the order until the Notice to Proceed, the rebate pre-approval and the utility's approval are all in hand. The loan can advance up to 50% of the estimated project cost for deposits.

The program's checklist still names the Canada Greener Homes Loan as an example of funding that stacks. That federal loan stopped taking applications on 2025-10-01, as the program's own FAQ notes.

Questions to ask your installer before you apply

Six answers tell you whether an installer can carry the application through to the rebate:

Are you a licensed electrical contractor?
The program pays only for systems a licensed electrical contractor designs and installs.
Will you file both applications?
The contractor submits the pre-installation application and the post-installation claim on your behalf.
Is the quote split the way the program reads it?
Solar and battery on separate lines, each in material, labour and other costs before tax, dated within 60 days.
Is the system sized to my last 12 months of use?
A load displacement system is sized to what the house uses, and a larger one is asked for bills.
Is the equipment bought in Canada, and will I own it?
Leased and third-party-owned systems do not qualify.
Who handles the permit, the ESA inspection and the utility approval?
The claim needs the ESA Certificate of Acceptance and the utility's connection approval.

How KAJK handles the application

KAJK Constructors handles the pre-approval and paperwork for qualifying homes. We are licensed, file the ESA notification on every install, and are a member of the Canadian Renewable Energy Association (CanREA), the association the program refers homeowners to when they look for an installer.

Our free assessment models your roof for the rebate and for net metering, for residential solar and a paired home battery. Call (613) 869-8254 or book a free assessment.

Our process is simple

If you need solar energy solutions, we'll be there from conception to completion. We have the experience and accreditation to lead the way in all phases of your solar project. Here's what you can expect.

  1. Consultation

    From your initial assessment to project management, budgeting, scheduling and acquiring your permits, we handle all major aspects of your project.

  2. Design

    We design your solar project to ensure that it meets your needs in the most affordable way possible. We do it all, including system designs to as-built drawings.

  3. Procurement

    We acquire the best quality materials for your project at the lowest cost possible, giving you the best value for your dollar.

  4. Construction

    Our project manager leads all construction projects to ensure that installation, construction and maintenance projects go smoothly and efficiently.

  5. Warranty, operation & maintenance

    Once your system is running, we stay with it: warranty support, operation, maintenance and repairs, including on systems other installers put in.

Questions we get asked

Does Ontario have a solar panel rebate in 2026?

Yes. The Home Renovation Savings Program pays $1,000 per kW of new rooftop solar, up to $5,000, and $300 per kWh for a battery paired with it, up to $5,000, each capped at half of eligible costs (Enbridge Gas and IESO, read 2026-10-28). A system that takes the rebate is used for the home's own power and is not net-metered.

Who runs the Home Renovation Savings Program?

Enbridge Gas and the IESO, Ontario's electricity system operator, under its Save on Energy brand, with the support of the Government of Ontario. The IESO runs the solar and battery stream: it approves the applications and pays the rebate.

Can I apply for the solar rebate myself?

You start it yourself, with the eligibility form on homerenovationsavings.ca, and you sign the participant agreement. Your contractor files the pre-installation application and the post-installation claim, and the system has to be designed and installed by a licensed electrical contractor.

Is there a tax credit for installing solar panels in Ontario?

For corporations, yes: the federal Clean Technology Investment Tax Credit covers up to 30% of the capital cost of solar and storage equipment for taxable Canadian corporations and real estate investment trusts (Canada Revenue Agency, read 2026-10-10). For a home, the support is the Home Renovation Savings rebate, and in Ottawa the Better Homes Ottawa Loan can finance the rest.

Is it better to get more solar panels or a bigger battery for the rebate?

Size both to the house. The panel rebate stops growing at 5 kW and the battery rebate at about 16.7 kWh, and the program wants the battery sized to the new panels and charged mainly from them. The 13.5 kWh battery the program calls typical earns up to $4,050.

What are the Ontario rebate programs for 2026?

Home Renovation Savings covers more than solar: heat pumps, heat pump water heaters, insulation, windows and doors, air sealing, smart thermostats and appliances, some through a home energy assessment and some without one. Businesses apply to Save on Energy's Retrofit Program. KAJK installs the solar and battery measures.

Can I get the solar rebate on a cottage or a new home?

Yes, when it is connected to the Ontario grid. Second homes such as cottages qualify, an owner can apply once for each home they own, and a new build qualifies once it is occupied when the pre-installation application goes in.

Sources for this page (12), last read 2026-10-28
  1. Go solar and save up to $5,000 backHome Renovation Savings (Enbridge Gas and IESO), read 2026-10-28
  2. Help and support (solar panels and battery storage FAQ)Home Renovation Savings (Enbridge Gas and IESO), read 2026-10-28
  3. Solar and Storage Program Stream Requirements, version October 2025Home Renovation Savings (Enbridge Gas and IESO), read 2026-10-28
  4. Solar and Storage Program Stream Participant Agreement, version October 2025Home Renovation Savings (Enbridge Gas and IESO), read 2026-10-28
  5. Solar and Battery Storage Pre-Installation Application Checklist for Contractors, version October 2025Home Renovation Savings (Enbridge Gas and IESO), read 2026-10-28
  6. Solar and Battery Storage Post-Installation Application Checklist, version October 2025Home Renovation Savings (Enbridge Gas and IESO), read 2026-10-28
  7. Solar and Battery Storage invoice requirements (sample invoice)Home Renovation Savings (Enbridge Gas and IESO), read 2026-10-28
  8. Ontario Launches New Energy Efficiency Programs to Save You Money (2025-01-07)Government of Ontario (news.ontario.ca), read 2026-10-01
  9. DER connection processHydro Ottawa, read 2026-10-28
  10. Solar collector systems (Do I need a building permit?)City of Ottawa, read 2026-10-01
  11. Better Homes Ottawa Loan ProgramBetter Homes Ottawa (City of Ottawa program), read 2026-10-28
  12. Who can claim, Clean Technology ITCCanada Revenue Agency, read 2026-10-10
Aerial view of black rooftop solar panels KAJK installed on an Orléans home in Ottawa

Contact Ottawa's solar energy experts

Ready to get started? Give us a call or send us a quick message for all your solar and green energy needs. The free assessment looks at your roof or site, your last year of electricity use and what you want the system to do, then comes back with a concept design, costs and the equipment we would use.

Book a free assessment(613) 869-8254

Monday to Friday, 9 a.m. to 5 p.m.
Saturday and Sunday: closed, visits by appointment